Skip to content Skip to main navigation Skip to footer

Overview

The Jackson Building is a stand-alone 1 million sf warehouse/distribution building constructed in 1998 and currently owned by Echo Environmental. Located just outside of Waverly, Ohio at the intersection of US-32 and US-23, with convenient four-lane access to Columbus, Cincinnati and Charleston. 28’ clear height with 96 docks and 4 drive in doors. ESFR sprinkler. Heavy utilities, rail access, abundant parking/trailer parking. Located in the Zahn’s Corner Industrial Park. Immediately available.

Currently Available For Sale or Lease

479 Industrial Park Drive, Waverly, Ohio 45690
Sale price: $11,500,000
Lease Price per sq. ft.: $2.50

Contact:
Gary Arnett, Economic Development Director
Phone: 740-947-4104 gary@pikecountydevelopment.com

Detailed Information:
Land Information
Transportation
Utilities
Site Infrastructure Summaries
Site Summary PDF

Land Information

Building Information

Type:
Industrial – Vacant
Status:
Available
Min. Ceiling Height:
23 ft. 8in
Max. Ceiling Height:
28 ft. 7in
Available Square Feet:
1.021,404 sf.

Building Features

Docks with Levelers:
96
Drive-in Doors:
4
Truck Docks:
96
Column Spacing:
48 x 48 with 68 ft. speed bays
Heat:
Yes

Site Information

Industrial Park:
Yes
Site Size:
84.09 acres
Parking:
Paved (550+ auto/400+ trailer)
Previous Use:
Manufacturing
Ownership:
SODI (Public Organization)

Pricing Terms

Sale Price:
$11,500,000
Lease:
Triple-Net
Lease Price per sq. ft:
$2.50

Location

County:
Pike
Site Address:
479 Industrial Park Drive, Waverly OH
City/Town:
Seal Township

Transportation

Road

4-Lane Highway/ Distance:
US 23/ 3.7 miles
4-Lane Highway/ Distance:
OH 32/ 1.6 miles
US Interstate/ Distance:
I-64/ 60 miles
US Interstate/ Distance:
I-71/ 63 miles
US Interstate/ Distance:
I-70/ 63 miles

Air

Airport Major Commercial:
John Glen International Airport (CMH) in Columbus, OH
Distance to Commercial Airport:
75 miles
Airport Cargo/ Intermodal Rail:
Rickenbacker International Airport (LCK)
Distance to Cargo Airport:
59 miles
Airport Local:
Pike County Airport

Water

Barge Port:
Conley River Terminal
Distance to Port:
29 miles
Barge-Intermodal Rail Port:
South Point Industrial Park
Distance to Port:
63 miles

Rail

Rail Name:
CSX
Access:
No – Plan developed for rail siding into the park
Distance to Rail:
adjacent to property boundary

Utilities

Electric

Electric Provider:
AEP
Electric Voltage:
12kV
Electric Phase:
3
Capacity:
10MW

Gas

Gas on Site:
Yes
Gas Provider:
Pike Natural Gas
Gas Main PSI:
300 psi
Size of Gas Main:
6 inch

Sewer

Sewer on Site:
Yes
Sewer Provider:
Pike Sewer District
Sewer Main Size:
8 inch
Total Capacity:
500,000 gpd
Excess Capacity:
450,000 gpd

Water

Water on Site:
Yes
Water Provider:
Pike Water, Inc
Water Main Size:
8 inch
Water Capability:
500,000 gpd
Excess Capacity:
200,000 gpd

Telecommunications

Telecom on Site:
Yes
Telecom Provider:
Several providers in area
Fiber Optics:
Yes
Fiber Provider:
META Solutions

Infrastructure Summaries

LAND DETAILS

Zoned manufacturing
Building is heated
96 docks with levelers
EFSR sprinkler system
4 drive in doors
96 truck docks
Paved parking ration: .92 per 1,000 sf.

TRANSPORTATION

Rail Provider – CSXT – 0.1 miles from site

Interstate 1 – I71- 63 miles from site

Interstate 2 – I70 – 63 miles from site

Interstate 3 – I64 – 60 miles from site

Hwy 1 – State Route 23 – 3.7 miles from site

Hwy 2 – State Route 32 – 1.6 miles from site

Hwy 3 – State Route 35 – 23 miles from site

Port – McGovney River Terminal – 26 miles from site

Airport 1 – Pike County Regional Airport – 9.6 miles from site

Airport 2 – Port Columbus International Airport – 107 miles from site

Airport 3 – Cincinnati International Airport – 75 miles from site

UTILITIES

Electric Provider – American Electric Power – electric voltage – 12 KV – Phase 3 – AEP is capable to provide 10 MW. The company will have to contact AEP (Chuck Corbitt AEP Economic Development)

Gas Provider – Pike Natural Gas –gas main PSI – 300 – size of gas main – 6 – Capable of 100,000 mdcfd

Water Provider – Pike Water – Water main size – 8 – total capacity 500,000 gpd – excess capacity 450,000 gpd

Waste Water Provider – Pike County Sewer District – Sewer main – 8 – average usage 250,000 gpd- total Capacity 500,000 gpd – Excess capacity 200,000 gpd

DSL – yes

Fiber Optics – yes – META Solutions is the current fiber provider

There are several fiber providers in the area. Southern Ohio Communication Services, Inc. also has service near the site and Horizon is 1 ½ miles away and can be ran to the site.

Telecom on site – yes- META Solutions is the current telecom provider – There are several telecommunication providers in the area. META Solutions, Southern Ohio Communication Services, Inc.(SOCS), and Horizon.